Building Under way
Littlle Toot Footing
Emergency Power Building
Emergency Power Building
Transmitter Building June 1956
ABN Transmitter Building Under way
Transmitter Building with Little Toot footing
Emergency Power Building commenced
ABN Studios and Transmitter Emergency Power Building
ABN Transmitter Building June 1956
Early Stage Transmitter Installation.
Monitoring Console Assemble
Installation Progress of Console
Installing Rack Equipment
18Kw Transmitter Installation
Early Stage of Transmitter Installationn
Monitoring Console Assembly
Installation Progress of Console
Installing Rack Equipment
18Kw Transmitter Installation
Rear 5Kw transmitter under test
Equipment Rack Assembly
Marconi Sound and Vision Transmitters
Marconi Vision Transmitter
Monitoring and Control Desk
Rear of 5Kw transmitter under test
Equipment Rack Assembly
Marconi Sound and Vision Transmitters
Marconi Vision Transmitter
Monitoring and Control Desk
Brian Madeley at the Monitoring Desk
Marconi Picture and Waveform Monitor
George Paterson at CRO
Back
Brian Madeley at the Monitoring Desk
Marconi Picture and Waveform Monitor BD657e
George Paterson using an Oscilloscope for testing
     

Valid HTML 4.01 Transitional